02 / PANEL HANDLING & TEMPORARY STABILITY

Lifting & Bracing
Engineering

Project-specific engineering support for panel lifting arrangements, temporary bracing and the associated drawing and calculation package.

Discuss this service
Construction visualization of panel lifting and temporary bracing

SERVICE SCOPE

Defined inputs. Coordinated engineering. Reviewable outputs.

We coordinate panel geometry, lifting arrangements and temporary support requirements within the agreed engineering scope. Calculations and layouts are developed together so assumptions, component information and reactions can be reviewed as a coordinated package.

01

Panel data & engineering basis

Review panel geometry, openings, weight basis, center-of-gravity information and material properties supplied for the relevant construction stage.

02

Lifting arrangements

Lifting insert locations, pick-point arrangements and rigging layouts coordinated with the panel configuration and agreed handling requirements.

03

Bracing arrangements

Temporary brace layouts and calculations, with attachment locations and panel access requirements considered in the agreed scope.

04

Temporary stability & wind

Review the agreed temporary-stage loading criteria, wind inputs and stability conditions relevant to the bracing arrangement.

05

Support reactions & interfaces

Document reactions for coordination with the responsible foundation or slab designer and the project’s support and anchorage requirements.

06

Engineering drawings & revisions

Coordinate layouts with calculations, identify governing assumptions, and update the affected package when approved inputs change.

DELIVERY PROCESS

From project inputs
to a controlled submission.

Each stage connects the work performed with a defined output. The project scope and review requirements are agreed before production.

  1. 01

    Confirm inputs and responsibilities

    Establish the panel data, project location, construction-stage requirements, component information and the scope of each design responsibility.

    STAGE OUTPUT

    Documented engineering basis

  2. 02

    Develop lifting and bracing arrangements

    Prepare preliminary lifting, rigging and brace layouts coordinated with panel geometry, openings and the agreed site requirements.

    STAGE OUTPUT

    Coordinated arrangement for review

  3. 03

    Prepare calculations and reactions

    Develop the scoped engineering calculations using confirmed inputs and applicable component data. Record support reactions and assumptions.

    STAGE OUTPUT

    Calculation package and reaction information

  4. 04

    Review the coordinated package

    Check input consistency, calculation-to-layout agreement and component references. Resolve review comments and recheck affected outputs.

    STAGE OUTPUT

    Reviewed drawings and calculations

  5. 05

    Issue and control changes

    Submit the agreed package with its issue status. Reassess affected engineering when geometry, components or construction conditions change.

    STAGE OUTPUT

    Controlled engineering submission

QUALITY ASSURANCE & QUALITY CONTROL

Checks that support
clear, consistent deliverables.

Quality assurance defines the review requirements. Quality control checks the package against those requirements and the governing project inputs.

Lifting & Bracing Engineering quality control review areas
Review areaWhat we check
Input consistencyPanel geometry, openings, weight basis, material properties and construction-stage data used consistently throughout the package.
Lifting coordinationInsert locations, pick points and rigging information checked against the corresponding panel and calculation references.
Bracing & stabilityBrace configuration, attachment information, temporary-stage load assumptions and stability checks aligned with the engineering basis.
Components & reactionsComponent references, capacities and support reactions reconciled with the specified arrangement and supplied manufacturer information.
Engineering issue controlDrawings and calculations carry matching revisions; assumptions, limitations, review comments and unresolved dependencies are identified.
BEFORE ISSUE

Record review comments, incorporate corrections, recheck affected items and confirm the package revision and issue status. Open items are identified for client resolution.

PACKAGE & INPUT REQUIREMENTS

A clear scope.
A defined handover.

The final deliverable list, file formats, responsibilities and submission schedule are confirmed for your project.

WHAT YOU RECEIVE

Typical deliverables

  • Lifting insert and rigging layout drawings
  • Temporary bracing layouts and scoped calculations
  • Support and foundation reaction information
  • Engineering assumptions, notes and revision record

PDF drawing packages; editable files, calculation formats and schedules as agreed in the scope.

WHAT WE NEED TO START

Project inputs

  • Coordinated panel drawings and geometry data
  • Material properties and concrete strength requirements
  • Project location and temporary-stage design criteria
  • Lifting and bracing component manufacturer information
  • Agreed handling sequence, site constraints and support details

LET’S DEFINE YOUR REQUIREMENTS

Planning a lifting & bracing package?

Share your drawings, required scope and target submission date. We’ll discuss the package and next steps with you.